Step 1: Site Visit

The step starts with a site visit and ends with an initial set of measurements and a record of clients’ choices for laminate material, granite, handles & hinges and appliances to be used in the initial drawing. We also collects clients’ inputs. Site visits last 30 min to two hours depending on size of the project.

Step 2: Design Iterations

This stage starts with an initial design based on information (measurements, appliances, client’s inputs etc…) from the previous stage. Here we work with the client through a few design iterations to come up with to a final design. This stage ends with a quotation based on the agreed upon drawings.

Duaration: 2 - 4 days.

Step 3: Fabrication

Before any fabrication work starts client deposits 70% of the quoation. We typically give two to 3 weeks for project completion. This can be longer or shorter based on the size of the project.

Duration: 1 to two weeks

Step 4: Delivery & Installation

Take a minute to write an introduction that is short, sweet, and to the point. If you sell something, use this space to describe it in detail and tell us why we should make a purchase. Tap into your creativity. You’ve got this.

Duration: Two days